{"id":2096,"date":"2020-07-07T15:00:14","date_gmt":"2020-07-07T13:00:14","guid":{"rendered":"https:\/\/www.incyma.es\/inicio\/?p=2096"},"modified":"2026-02-05T18:54:07","modified_gmt":"2026-02-05T17:54:07","slug":"instruccion-tecnica-sobre-el-control-de-produccion-de-hormigones-de-central-rd-163-2019","status":"publish","type":"post","link":"https:\/\/www.incyma.es\/en\/instruccion-tecnica-sobre-el-control-de-produccion-de-hormigones-de-central-rd-163-2019\/","title":{"rendered":"Technical Instruction on the control of concrete production from central batching plants (RD 163\/2019)"},"content":{"rendered":"<p style=\"text-align: justify;\"><span style=\"font-family: 'trebuchet ms', geneva, sans-serif;\">The law came into effect on July 1, 2019 <a href=\"https:\/\/www.boe.es\/diario_boe\/txt.php?id=BOE-A-2019-5332\" target=\"_blank\" rel=\"noopener noreferrer\"><span style=\"font-size: 12pt;\">Royal Decree 163\/2019<\/span><\/a> which approves the Technical Instruction for carrying out the production control of concretes manufactured at the plant.<\/span><\/p>\n<p style=\"text-align: justify;\"><span style=\"font-family: 'trebuchet ms', geneva, sans-serif;\">This Royal Decree replaces the old Ministerial Order of November 21, 2001 and updates the requirements to the new regulations, such as Regulation (EU) 305\/2011 for Construction Products, the Cements Instruction (RC16), Eurocode 2 and the Structural Concrete Instruction (EHE 08).<\/span><\/p>\n<p style=\"text-align: justify;\"><span style=\"font-family: 'trebuchet ms', geneva, sans-serif;\">It will be <strong><span style=\"font-size: 12pt;\">mandatory<\/span><\/strong> from <strong><span style=\"font-size: 12pt;\">March 2021<\/span><\/strong>, In order for the concrete plant to obtain its certificate, all plants must be periodically evaluated by an independent body that will verify that the control of the concrete&#039;s component materials and their storage, the facilities, concrete control, documentation, and traceability comply with the technical criteria set out in Royal Decree 163\/2019. From its entry into force, a period of 21 months is established for the concrete plant to obtain this certificate.<\/span><\/p>\n<p style=\"text-align: justify;\"><span style=\"font-family: 'trebuchet ms', geneva, sans-serif;\">In <a href=\"https:\/\/www.incyma.es\/en\/sistemas-de-gestion-3\/\" target=\"_blank\" rel=\"noopener noreferrer\"><strong><span style=\"font-size: 12pt;\">INCYMA<\/span><\/strong><\/a>, We implemented the evaluation procedures to be verified by an auditing body. <\/span><span style=\"font-family: 'trebuchet ms', geneva, sans-serif;\">Independently accredited and obtain the certificate of conformity for the concrete plant. Furthermore, these procedures can be integrated with other systems, such as ISO 9001 and CE Marking.<\/span><\/p>\n<p><strong><span style=\"font-family: 'trebuchet ms', geneva, sans-serif;\">Who is it aimed at?<\/span><\/strong><br \/>\n<span style=\"font-family: 'trebuchet ms', geneva, sans-serif;\">Mandatory for all ready-mix concretes manufactured in concrete plants located within the national territory.<\/span><br \/>\n<span style=\"font-family: 'trebuchet ms', geneva, sans-serif;\"><strong>Related sectors:<\/strong> Construction, Civil Works, Building.<\/span><\/p>\n<p><span style=\"font-family: 'trebuchet ms', geneva, sans-serif;\">SHALL WE TALK?<strong><span style=\"font-size: 12pt;\"> 670 036 546<\/span> \/ <\/strong><a href=\"mailto:info@incyma.es\" target=\"_blank\" rel=\"noopener noreferrer\">info@incyma.es\u00a0<\/a><\/span><\/p>\n<p>&nbsp;<\/p>\n<a href=\"https:\/\/drive.google.com\/file\/d\/1lCTUlg7C-WBNEMK8HrwDsFlw8RkTgsJo\/view?usp=sharing\" class=\"icon-button download-icon\" target=\"_blank\" rel=\"noopener\">DOWNLOAD CONCRETE DOSSIER<span class='et-icon'><\/span><\/a>","protected":false},"excerpt":{"rendered":"<p>In March 2021, it will be mandatory for all concrete plants to have their certificate in accordance with Royal Decree 163\/2019.<\/p>","protected":false},"author":5,"featured_media":2101,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_et_pb_use_builder":"off","_et_pb_old_content":"","_et_gb_content_width":"","footnotes":""},"categories":[15],"tags":[170,164,168,166],"class_list":["post-2096","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-noticias-incyma","tag-fabricacion-hormigon","tag-hormigon","tag-plantas-de-hormigon","tag-real-decreto-169-2019"],"_links":{"self":[{"href":"https:\/\/www.incyma.es\/en\/wp-json\/wp\/v2\/posts\/2096","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.incyma.es\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.incyma.es\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.incyma.es\/en\/wp-json\/wp\/v2\/users\/5"}],"replies":[{"embeddable":true,"href":"https:\/\/www.incyma.es\/en\/wp-json\/wp\/v2\/comments?post=2096"}],"version-history":[{"count":10,"href":"https:\/\/www.incyma.es\/en\/wp-json\/wp\/v2\/posts\/2096\/revisions"}],"predecessor-version":[{"id":3082,"href":"https:\/\/www.incyma.es\/en\/wp-json\/wp\/v2\/posts\/2096\/revisions\/3082"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.incyma.es\/en\/wp-json\/wp\/v2\/media\/2101"}],"wp:attachment":[{"href":"https:\/\/www.incyma.es\/en\/wp-json\/wp\/v2\/media?parent=2096"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.incyma.es\/en\/wp-json\/wp\/v2\/categories?post=2096"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.incyma.es\/en\/wp-json\/wp\/v2\/tags?post=2096"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}